| UPT has a strong background and knowledge of  the Power Distribution and transmission sector which has helped us to undertake,  complete and execute turnkey electrification projects from conceptualization,  design, engineering, procurement, erection and commissioning. Works undertaken by UPT includes:
                    Rural  Electrification planning and commissioning Setting  up of LT lines for Urban/ Rural networks erection  of 11 kVA and 33 KVA Distribution Substations Laying  of 11 Kva and 33 Kva Power LinesEnergy  auditing We have executed a prestigious project under  APDRP projects during the year 2005-06, 2006-07 of the town area of Allahabad.  It included supply and erection of materials  for increase in capacity and renovation and modernization work of 11/0.433  Kv  and construction of new 11/0.433 Kv  distribution sub stations, construction of D.T. plinth, fencing, installation  of Henley type fuse unit along with pillar box, metering of D.T. through L.T.  electronic TVM, at Allahabad Town. The scope of the worked involved supply,  transportation, carriage, erection, installation, testing and commission of all  equipment along with associated accessories complete in all respect. |