UPT not only designs and manufacture new transformers but it has also developed extensive capabilities in repair and re-engineering of damaged transformers of all makes.
Since beginning we have been repairing damaged power ad distribution transformers, 33/11 kV from 3 MVA up to 10 MVA and from 10 KVA to 1500 KVA in the 11/0.433 – 0.250 kV respectively.
Our vast experience and repair processes allow us to reverse engineer and improve/ modify designs of existing transformers in extremely short intervals. Our repair process is geared towards ensuring longevity of the refurbished transformer at the most cost effective price and every care is taken to reuse components that are fine and replace defective components with high quality replacements.
Our fast delivery schedules (Turn Around Time of between 15 days to 8 weeks) make us an ideal partner for repair jobs. |