"Quality is never an accident; it is always the result of high intention, sincere effort, intelligent direction and skillful execution; it represents the wise choice of many alternatives."
By — Willa A. Foster
Member
Content on this page requires a newer version of Adobe Flash Player.
Quality Control Process
Steps to ensure quality control:
Transformers designed by qualified electrical engineers as per specification provided by the client and IS 1180 / 2026, to ensure that parameters of transformers do not exceed figures provided in ISS. And customer specification.
For any new transformer rating/specification design is developed on computer aided software.
On receipt of confirmed order from client, materials are ordered for the complete requirement with a strict delivery schedule. It is mandatory to provide test certificates, by the suppliers.
Each and every major operation during assembly, have been divided in sub departments, which carry out a specialized task. This brings a very high quality of consistency. (AUTOMATION ACHIEVED IN VARIOUS SECTIONS OF PRODUCTION)
Sample checking at all stages of manufacturing is done - as detailed in our standard process control plan. Each and every transformer manufactured is tested for all routine tests provided in IS -1180 / 2026.